Battery & storage

Battery size for 1 week backup

Enter the loads you want backed up for a full 7 days with zero recharge. See just how large battery-only sizing gets at this duration, and why most week-long plans add solar or a generator.

Your numbers

1 Project details Optional
Shown on your exported report. Leave blank to skip.
2 Your loads
A trimmed load list matters most at this duration. Add up running watts for true essentials only.
Defaults to 7. Adjust if you want a slightly different window.
3 Battery characteristics

How it works

Three steps to a 1 week battery size

Step 1

Trim your load list aggressively

At a week-long duration, every watt matters enormously. The critical loads calculator helps identify the smallest realistic list.

Step 2

See the real battery-only number

Battery-only sizing at 7 days is genuinely large. Use this tool to see exactly how large before deciding on your approach.

Step 3

Add solar or a generator instead of pure battery scaling

For most households, this is the more affordable path to real week-long autonomy. The solar recharge sizing tool shows what changes when solar is part of the plan.

Understanding 1 week backup sizing

Why battery-only week-long backup gets expensive fast

Even a heavily trimmed critical loads list at 400 watts requires roughly 7 batteries to cover a full week with zero recharge assumed. Since batteries are typically the largest cost component in a backup system, this scale of battery-only sizing is rarely the most practical or affordable way to reach a week of autonomy, a cost the quick financing comparison tool in our Financing category can put into concrete terms. This calculator shows the number specifically so it's clear why most real-world week-long plans look different from simple battery scaling.

What actually calls for week-long planning

Wildfire public safety power shutoff events, which can last several days by design, severe hurricane damage that takes utilities a week or more to repair, and remote rural properties with a documented history of slow restoration are the main scenarios where planning for a full week is genuinely warranted rather than excessive, consistent with outage-duration data tracked by the U.S. Energy Information Administration. The wildfire PSPS planning tool addresses the first of these directly.

Why solar and generator combinations make more sense here

Adding daily solar recharge, assuming reasonable sun exposure across the week, or a generator as an additional backstop, both address week-long autonomy far more affordably than scaling battery capacity to cover the entire period with zero outside input, an approach the Department of Energy's inverter basics guide covers as a standard grid-tied-with-battery configuration. A combined system might need only 1 to 2 batteries plus solar recharge, compared to 6 to 10 batteries for a pure battery-only approach at the same duration. The solar recharge sizing tool models this combined approach, and the hybrid inverter sizing calculator in our Inverters & Equipment category covers the inverter needed to support it.

What to do with this number next

Use this battery-only figure as a baseline for comparison, then check the storm season backup planning tool to see how much a combined approach can reduce it. The battery count vs autonomy tool also lets you experiment with different duration and unit size combinations. If this week-long scenario needs to account for EV charging too, the EV charging with generator backup comparison in our Solar + EV Integration category covers that combined planning. The hybrid inverter sizing calculator checks whether your inverter can handle this result.

Questions

Frequently asked

A trimmed 400 watt critical loads circuit running continuously for a full 168 hour week needs about 81 kWh of nameplate battery capacity, or roughly 7 batteries at 13.5 kWh each. This is why 1 week battery-only planning almost always includes solar recharge or generator backup instead of battery alone.

Rarely, for cost reasons. A week of pure battery backup with zero recharge typically requires 6 to 10 batteries even for a trimmed load list, which becomes an expensive way to solve a problem that solar recharge or a generator can usually address more affordably.

Wildfire public safety power shutoff events, severe hurricane damage to grid infrastructure, and remote or rural properties with historically slow utility restoration are the main scenarios where a full week of planning is genuinely warranted. The wildfire PSPS planning tool covers the first of these directly.

For most households, yes. A combined approach, using solar to recharge the battery daily and a generator as a further backstop, covers a week-long outage far more affordably than scaling battery capacity alone to cover the entire period with zero outside input.